Call for Proposals Engineering services to design site plans, including sediment and erosion control BMPs, and traffic control plan on 2 sites in Murray County.
Both sites are county roads. The project will be installed as bottomless 3 sided culverts to allow for fish passage and pass the 100 year storm. Expected culvert sizing will be 12’x5’ and 15’x4’ for the respective sites.
Sites are located on Holly Creek Cool Spring road
Site 1: 34°48'7.47"N 84°42'21.92"W
Site 2: 34°48'1.37"N 84°42'35.81"W
Submit all proposals for design contract no later than 4/15/26 by 5pm EST to Admin@limestonevalley.org Subject: HCCS FAC culverts